Data Center

Testing and Commissioning of Struxtureware Building Operation in Data centres

Data center commissioning is important to ensure a mission critical facility can support its workload as anticipated.

Our Testing and Commissioning of Data centre includes,

  • Level One Commissioning – Factory Witness Testing
  • Level Two Commissioning – Site Acceptance Inspection
  • Level Three Commissioning – Pre Functional Testing & Start Up
  • Level Four Commissioning – Functional Performance Testing
  • Level Five Commissioning – Integrated Systems Testing

The Integrated System Test (IST) is pinnacle of the commissioning program, and the performance of these activities demonstrates the performance of the facility as a whole against the owner’s project requirements.  The commissioned systems are operated at various loads and in various modes to demonstrate fully automated operation and proper response to equipment failures and utility problems.